Cement & steel in Iraq,
supplied.
Kilns, mills, furnaces and rolling lines run on large motors, the switchgear feeding them and the cables between. DAC quotes, sources and delivers that layer — genuine, documented, door-to-door across Iraq’s 18 governorates.
Request a Quote or email your part numbersWhat DAC supplies for cement & steel
=A Automation & drives
PLCs and I/O for kiln, mill and line control, HMIs, VFDs for fans and conveyors, sensors. Automation & Drives →
=Q Electrical & control
ACBs, MCCBs and motor protection for MCC feeders, contactors, overload relays, power supplies, terminals. Electrical & Control →
=B Instrumentation
Pressure and temperature transmitters, radar level for silos, flow for water and fuel, test tools. Instrumentation →
=P Panel workshop
MCCs and control panels for motor groups, built in Erbil to IEC 61439 practice, FAT tested before delivery. Panel Workshop →
=W Cables & materials
Power cable for motor feeders, screened control and instrumentation cable, glands, trays, lugs. Cables & Materials →
=S Tailored sourcing
Phased-out PLC modules, legacy drives and discontinued breakers, condition and warranty stated first. Tailored Sourcing →
Typical equipment and brands
Documentation, delivery and lead times
Documents
Every shipment: commercial invoice, packing list, certificates of origin and manufacturer documentation (datasheets, test reports, certificates). Quotations carry HS codes.
Delivery
Door-to-door to site, warehouse or camp across Iraq’s 18 governorates. Delivery terms on request.
Lead times
Stock items dispatch within 1 working day; items not in stock usually arrive in 5 to 10 days door-to-door; configured or factory-built items follow the manufacturer’s production lead time, stated in every quotation.
Warranty
Manufacturer warranty on genuine new material; sourced or obsolete parts: condition and warranty per quotation.
MCCs for motor groups, built in Erbil
Motor control centers and control panels for cement and steel lines are assembled, wired, marked and tested in DAC’s own Erbil workshop to IEC 61439 practice, FAT tested before delivery, with as-built drawings and test reports. Panel Workshop →