Oil & gas in Iraq,
supplied.
Instrumentation, Ex equipment, motor control centers and process cables for refineries, gas plants and fields: 500+ product lines, quoted from Erbil with full documentation, delivered across Iraq's 18 governorates.
Request a QuoteWhat DAC supplies for oil & gas
=B Instrumentation
Flow, level, pressure and temperature transmitters, analytical instruments, control valves, positioners, calibrators and test tools. Instrumentation bay
=Q Electrical & control
LV switchgear, circuit breakers, contactors, relays, 24 V DC power supplies, terminals and enclosures. Electrical bay
=A Automation & drives
PLCs, remote I/O, HMIs, VFDs for pumps and compressors, sensors and identification. Automation bay
=P Panel workshop
MCCs and control panels built and FAT tested in Erbil to IEC 61439 practice. Panel workshop
=W Cables & materials
Power, control and instrumentation cables, glands, trays and wiring material. Cables bay
=S Tailored sourcing
Hard-to-find, obsolete and specified parts via our sourcing desk in Germany, condition and warranty stated first. Sourcing bay
Typical equipment and brands
Brand names are trademarks of their owners. DAC is an independent supplier, not affiliated with, authorized by or endorsed by any of them.
Documentation, delivery and lead times
Documents
Every shipment: commercial invoice, packing list, certificates of origin and manufacturer documentation (datasheets, test reports, certificates). Quotations carry HS codes.
Delivery
Door-to-door to site, warehouse or camp across Iraq's 18 governorates.
Lead times
Stock items dispatch within 1 working day; items not in stock usually arrive in 5 to 10 days door-to-door; configured or factory-built items follow the manufacturer's production lead time, stated in every quotation.
Terms & warranty
Delivery terms: on request — please ask. Manufacturer warranty on genuine new material; condition and warranty of sourced or obsolete parts stated per quotation.
MCCs and control panels, built in Erbil
Assembled, wired, marked and tested in DAC's own Erbil workshop to IEC 61439 practice; FAT before delivery, witnessed on request. Panel workshop